The 1st park includes a capacity of two hundred MW although Sandrini II has a potential of 100 MW. The total expense of the two projects were not disclosed having said that, during building, more than 200 staff were employed. The assignments are expected to discover A few positions opening https://solarcompanyinbakersfield.blogspot.com/