To begin with, the Jai Hind metro station was prepared for being elevated. Having said that, the AAI objected the elevated extend up to the airport may possibly pose a danger to aircraft, Therefore the route was even further reworked and also the station was shifted underground, 150 m through https://felixymamy.blog2news.com/32686706/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf